THE CHALLENGE
CBI provided architectural and engineering design services associated with floor repairs at the Canton Police Department.
CBI’S SOLUTION
The scope of work included removal of all existing finish flooring, plywood sub flooring, and leveling blocks and the installation of new resilient flooring, ceramic tile, seamless epoxy flooring and carpet with 6” over the new plywood sub floor and underlayment with continuous blocking.
To verify that all furniture removed was replaced in its original location after the repairs, CBI specified that all existing furniture be videotaped prior to the repairs.