John Duggan Middle School, Springfield

THE CHALLENGE

CBI designed repairs and produced construction drawings and specifications for repairs to the John Duggan Middle School pool. 

CBI’S SOLUTION

The scope of work included the removal of the existing heating and ventilating units and exhaust fans and installation of a new roof top unit with attendant ductwork, removal of the existing lighting and controls and installation of new lighting system and controls, and the installation of a new power feed, from the existing electrical service, to serve the new HVAC system.

The scope of work also involved the installation of a new finish ceiling system, removal and replacement of the existing soffits, tile repair, installation of new acoustical panels over the glass block, masonry repair, new pool markings, installation of a drinking fountain accessible from the pool deck, and the design of an emergency care facility adjacent to the pool.